top of page

Trenches closed Stages 17 and 18


Only 3 more weeks to Practical Completion. We have extended the Tollard Drive eastern side shared pedestrian/bike path a further 200 metres. DIER has built 200 metres at the other end so now we are waiting patiently for the Clarence City Council to commit to completing the gap to enable safe cycling out to the South Arm Highway bike path. We still have some near completed lots available all with spectacular water views. see webpage : https://www.northbay.net.au/stage-17


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page