Electricity Has Arrived
Tas networks are cabling stages17 and 18. We can now close the trenches and finish the roads. We expect practical Completion of these 2...
Shared Bicycle - Pedestrian Path Stage 17
This is the Southward extension of the 3 metre wide shared pedestrian an cycle path on the Eastern side of Tollard Drive. It is a part of...